[. . . ] 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] 275 Ibs. DESCRIPTION Model HCR2 is a production crusher capable of crushing four 1-gallon cans or seven 1-quart cans or one 5-gallon can. The crusher provides the following features: · Powerful 3. 75 ton cylinder crushing plate assures the force necessary to do the job when crushing up to 7 quart cans. Safe double lock door protects operator. Page 4 of 8 OWNER/OPERATOR RESPONSIBILITY It is the owner/operator responsibility to properly use and maintain this equipment. The instructions and warnings contained in this manual shall be read and understood by the owner/operator prior to operating this equipment. If an owner/operator does not understand English, the contents of this manual shall be explained in the owner/ operator native language to assure the owner/operator comprehends. It is the owner/operator responsibility to maintain the legibility of all warning and Instruction labels. The owner/operator shall retain this manual for future reference to important warnings, operating and maintenance instructions. Figure 1 INSTALLATION See Figure (1). The HCR2 should be set on a sturdy bench or table strong enough to support its weight. Connect the supplied pressure regulator/filter and oiler assembly to the 3/8" valve located on the back of the crushing chamber. Remove the bowl of the oiler and fill to 3/4 full with 30W non-detergent oil, replace bowl. Drip rate should be lowered if oil is noticed leaking from the cylinder. Connect the external air supply to the pressure regulator/filter. Control valve Oiler Filter/Regulator Mounting holes Page 5 of 8 INSPECTION Prior to operation a visual Inspection shall be made. Any crusher that appears to be damaged in any way, is badly worn or operates abnormally shall be removed from use until repairs are made. If over pressurizing of the equipment is believed to have occurred, contact a factory authorized service center for inspection of the crusher. An annual inspection by a factory authorized service center is recommended. Verify the pressure gauge on the pressure regulator/filter reads between 100 and 120 p. s. i. [. . . ] MAINTENANCE Regularly check the pressure filter/regulator moisture trap for water. Regularly clean the crusher chamber to remove any accumulated sludge, metal particles or any other debris that could affect the crusher operation. Apply grease to door hinges on a regular basis to prevent the door from binding. [. . . ]